Showing posts with label 2015 FAL. Show all posts
Showing posts with label 2015 FAL. Show all posts

Thursday, 9 July 2015

From A - 2015 Finish Along Q3 Goals

2015 FAL at On the Windy Side

It's that time again...time for another list of Finish Along goals.

I accomplished so few of my Q1 goals that I when I went to compile a list of Q2 goals, I realized that the list was almost identical. Discouraged, I decided that I would sit out Q2 and focus on trying to check a few things off my list so that I could get excited about Q3 with a fresh list of goals.

There are still quite a few stragglers on this list but I was able to make room for a couple of new projects so I decided it was time to get back on the band wagon.

1. Superstar Lonestar Quilt

Lone Star Layout 3

An oldie from 2013. This quilt is all done and ready for binding. I still need to beg for some more OOP yardage for my binding but assuming that's successful, this should be pretty quick to finish up.

2. P & B Swoon Quilt

P & B Swoon Quilt Top

The binding has been cut and pieced. Just need to sew it to the quilt top and do the hand stitching. Totally manageable.

3. Saltwater Quilt

Saltwater Color Block Quilt Blocks

This quilt has also been quilted and is just waiting for a binding (you be sensing a bit of a theme here). Looking forward to getting this done. I always forget how much work goes into making a queen-sized quilt.

4. Donuts Quilt

Donuts Quilt WIP

This is the last of the almost finished quilts that needs to be bound. Looks like I'll spend most of my quarter curled up on the couch with needle in hand!

5. Big Charming Quilt

IMG_5054

The top is finished and I have a plan for the back. Just need to piece the backing before I can send it off to be quilted.

6. Spoolish Quilt

6 of the 15 blocks needed for this quilt are finished. There are lots of tiny pieces in this quilt so it will be a bit of an adventure but hopefully I can stick with it for the last 9.


Spoolish Quilt Blocks

7. Meadow Quilt

An old WIP from a Lizzy House workshop I took back in 2013 right before moving to California. I worked on the blocks during the move but never actually got the whole thing wrapped up. I want to finish this by August so I can take it to Toronto with me in the Lizzy House Mystery Quilt class I signed up for.

Meadows Quilt WIP

8. Square Dance Quilt

Square Dance Quilt Fabrics

I'm hoping this quilt will be a walk in the park, a weekend commitment at best. I already have the print fabrics cut and now just need to cut the background fabric. Really looking forward to this one since Denyse Schmidt is one of my quilt heros and I think this will be the perfect way to showcase some of my favourite prints. 

10. Two Pairs of Stripey Socks

Gearing up for vacation, I decided to cast on a couple of pairs of socks. I really love knitting with self-striping yarn and these socks are no exception. The first pair is well underway and the second one is still in the planning stage.

Socks knit with Yarntini sock yarn

10. Snowfling Mitts

Snowfling Mitts

I started these in November 2013, just after seeing Kelsey's pair in real life. They are so wonderfully warm and cozy. I really want to get them finished before too much longer. There's still lots to do so we'll see how I make out.

11. Hiro Pullover

Hiro Pullover Sleeve

This sweater was on my Q1 list but got derailed when I was studying for the bar exam last winter. I really want to finish it but I've lost a ton of weight in the last few months and now it's way too big. A good problem to have but I'm still trying to work up the courage to rip and re-knit.

12. Striped Shawl

I knit a shawl using this gorgeous yarn. At this point it just needs to have the ends woven in and a good blocking. Shouldn't take too long but I am notorious for avoiding finishing work so we'll see.

Caterpillargreen Shawl Stripes in Peacock

It's an ambitious list but I'm crossing my fingers that I'll make some progress this quarter.

Saturday, 17 January 2015

From A - 2015 Finish Along Q1 Goals

After taking a bit of a blogging break, I'm ready to tackle my WIPs head-on. I have so many half-finished projects on the go at the moment that it seemed like an excellent idea to join Adrianne for the 2015 Finish-Along in the hopes that I'll get some stuff off my plate before a guest succumbs to a batting avalanche while sleeping in our "guest room."

1. Oh What Fun! Christmas Quilt

Oh What Fun! Blocks 
Intended as a Christmas 2014 gift, it didn't quite make it. I'm determined to get it ready for 2015. The top is finished and I just got this bad boy back from the longarmer. Now it just needs a binding and label.

2. Superstar Lonestar Quilt

Lone Star Layout 3

An oldie from 2013. I'm still working on piecing the background fabric to the star for this one. Once is finished it will need borders and backing before it can head off to the longarm quilter. I love this quilt and really want to get it finished.

3. P & B Swoon Quilt

P & B Swoon Quilt Top

Another oldie from the opening days of this blog in July 2012. It's been basted and ready to quilt since then but I keep putting it off since I'm intimidated by how big it is. I'm planning to unbaste it and make the backing a little bigger so I can send it off to be longarmed. Done is better than perfect at this point.

4. Flannel and Voile baby blankets

IMG_5055

I've made a few of these in the past and have five more that only need a satin binding sewn on. I'm not sure how many of these I'll get through this quarter but with another influx of babies due shortly, it would be great to get them all finished and re-homed!

5. Cutting Corners Quilt

IMG_5053

This is a small lap quilt that I worked on last summer. It's been quilted and just needs a binding before it can replace the down comforter on my couch as my go-to TV blanket. 

6. Saltwater Quilt

Saltwater Color Block Quilt Blocks

I started this as a bit of a stash busting, palette cleanser when the pressure of holiday sewing was starting to make me twitchy. The top is still in pieces so this will need a fair amount of time before it's ready to rock.

7. Big Charming Quilt

IMG_5054

I've convinced myself that this bad boy is a weekend commitment. Hoping I'm not too far off in my assessment.

8. Square Dance Quilt

Square Dance Quilt Fabrics

Another quilt that I've decided will be a walk in the park. I already have the print fabrics ready to sew and now just need to cut the background fabric. Really looking forward to this one since Denyse Schmidt is one of my quilt heros and I think this will be the perfect way to showcase some of my favourite prints. 

9. Dreamweaver Quilt

Color Blocks Quilt Fabrics

This Tula Pink fabric has been cluttering up my stash for far too long. Looking forward to actually enjoying some of it by getting it made into a quilt I've long admired.

10. Cerys Baby Blanket

Ceres Baby Blanket

This is from my January 2013 list so I'm pretty serious about getting this one done. I've finished knitting this one. Just have some finishing work (weaving in ends, stitching the picot edging down, blocking) left.

11. Snowfling Mitts

Snowfling Mitts

I started these in November 2013, just after seeing Kelsey's pair in real life over Thanksgiving. They are so wonderfully warm and cozy. I really want to get them finished before too much longer. There's still lots to do so we'll see how I make out.

12. Hiro Pullover

Hiro Pullover Sleeve

This sweater was a bit of a last minute add-on but now that I've started knitting it, I'm having a hard time stopping. With worsted weight yarn, knit in the round, this one is just flying off the needles.

Phewf! That list seems a lot longer written out than it did in my head. It should be an adventure!