Thursday 9 July 2015

From A - 2015 Finish Along Q3 Goals

2015 FAL at On the Windy Side

It's that time again...time for another list of Finish Along goals.

I accomplished so few of my Q1 goals that I when I went to compile a list of Q2 goals, I realized that the list was almost identical. Discouraged, I decided that I would sit out Q2 and focus on trying to check a few things off my list so that I could get excited about Q3 with a fresh list of goals.

There are still quite a few stragglers on this list but I was able to make room for a couple of new projects so I decided it was time to get back on the band wagon.

1. Superstar Lonestar Quilt

Lone Star Layout 3

An oldie from 2013. This quilt is all done and ready for binding. I still need to beg for some more OOP yardage for my binding but assuming that's successful, this should be pretty quick to finish up.

2. P & B Swoon Quilt

P & B Swoon Quilt Top

The binding has been cut and pieced. Just need to sew it to the quilt top and do the hand stitching. Totally manageable.

3. Saltwater Quilt

Saltwater Color Block Quilt Blocks

This quilt has also been quilted and is just waiting for a binding (you be sensing a bit of a theme here). Looking forward to getting this done. I always forget how much work goes into making a queen-sized quilt.

4. Donuts Quilt

Donuts Quilt WIP

This is the last of the almost finished quilts that needs to be bound. Looks like I'll spend most of my quarter curled up on the couch with needle in hand!

5. Big Charming Quilt

IMG_5054

The top is finished and I have a plan for the back. Just need to piece the backing before I can send it off to be quilted.

6. Spoolish Quilt

6 of the 15 blocks needed for this quilt are finished. There are lots of tiny pieces in this quilt so it will be a bit of an adventure but hopefully I can stick with it for the last 9.


Spoolish Quilt Blocks

7. Meadow Quilt

An old WIP from a Lizzy House workshop I took back in 2013 right before moving to California. I worked on the blocks during the move but never actually got the whole thing wrapped up. I want to finish this by August so I can take it to Toronto with me in the Lizzy House Mystery Quilt class I signed up for.

Meadows Quilt WIP

8. Square Dance Quilt

Square Dance Quilt Fabrics

I'm hoping this quilt will be a walk in the park, a weekend commitment at best. I already have the print fabrics cut and now just need to cut the background fabric. Really looking forward to this one since Denyse Schmidt is one of my quilt heros and I think this will be the perfect way to showcase some of my favourite prints. 

10. Two Pairs of Stripey Socks

Gearing up for vacation, I decided to cast on a couple of pairs of socks. I really love knitting with self-striping yarn and these socks are no exception. The first pair is well underway and the second one is still in the planning stage.

Socks knit with Yarntini sock yarn

10. Snowfling Mitts

Snowfling Mitts

I started these in November 2013, just after seeing Kelsey's pair in real life. They are so wonderfully warm and cozy. I really want to get them finished before too much longer. There's still lots to do so we'll see how I make out.

11. Hiro Pullover

Hiro Pullover Sleeve

This sweater was on my Q1 list but got derailed when I was studying for the bar exam last winter. I really want to finish it but I've lost a ton of weight in the last few months and now it's way too big. A good problem to have but I'm still trying to work up the courage to rip and re-knit.

12. Striped Shawl

I knit a shawl using this gorgeous yarn. At this point it just needs to have the ends woven in and a good blocking. Shouldn't take too long but I am notorious for avoiding finishing work so we'll see.

Caterpillargreen Shawl Stripes in Peacock

It's an ambitious list but I'm crossing my fingers that I'll make some progress this quarter.